Home / Services / Primavera P6 Scheduling

Primavera P6 scheduling and consulting

Primavera P6 schedules built and maintained so the logic can be followed from any milestone back to the work that drives it, and checked every update before it is reported.

Problems this solves

What the work covers

Baseline development

Activity structure, logic, durations and calendars set up with the team, with a written basis of schedule.

Update support

Weekly or monthly statusing against the data date, with validation before the update is issued.

Schedule health checks

Missing logic, open ends, constraints, high and negative float, relationship types, lags and out-of-sequence progress, each listed down to the activity.

Recovery schedules

Re-sequencing options scheduled again through the network, so the recovered dates come from the logic and not from edits to the milestones.

Typical deliverables

How the work runs

  1. Read the schedule as it is. Logic, constraints, calendars, float and progress checked against the data date before anything changes.
  2. Fix structure and logic. Missing links, open ends, hard constraints and long lags corrected with the planners who own the work.
  3. Baseline or re-baseline. The approved version stored as the original baseline (BL), kept fixed for every later comparison.
  4. Status and validate each update. Progress entered against the data date and checked before the update is issued.

See a working demonstration

Each demonstration opens on the home page with a fictional project and synthetic data. Sort, filter and drill into the records.

Discuss your project

Every service is billed at the same hourly rate. See pricing, call 713-303-7576 or send a project request.