Forensic schedule and delay analysis
When a milestone moves, the question is which activity moved it and through which logic. The analysis traces the driving path backward relationship by relationship and compares each update with the one before.
Problems this solves
- A key milestone slipped between updates and the cause is disputed.
- Several activities moved at once and it is unclear which one drives the milestone.
- Near-critical paths may take over once the critical path is recovered.
- A recovery proposal needs to show its effect through the whole network.
What the work covers
Slip analysis
Activities matched by Activity ID across updates, ranked by finish movement, with the field that changed.
Driving-path tracing
The predecessor with the least relationship float at each step, with relationship type, lag and dates shown as evidence.
Near-driving paths
Relationships within a set number of days of driving, so a second path is not missed.
Recovery scenarios
A proposed change scheduled through the network and the milestone re-forecast from the result.
Typical deliverables
- Slip register by update with the activities that moved
- Driving path from the milestone to its first open driver
- Relationship evidence: type, lag and relationship float
- Recovery scenario and its re-forecast milestone
This work supports project teams and their advisers. McKowen Project Controls does not provide legal opinions or expert-witness testimony.
How the work runs
- Collect the updates in order. Each schedule update identified by its data date, so every comparison is between consecutive snapshots.
- Find what moved. Activities matched by Activity ID; finish movement ranked by update and against the original baseline.
- Trace the cause. The driving path from the late milestone back to its first open driver, with the relationship evidence.
- Test recovery options. Each option scheduled through the network, with the milestone it recovers and by how much.
See a working demonstration
Each demonstration opens on the home page with a fictional project and synthetic data. Sort, filter and drill into the records.
- Open the Logic Tracer demonstrationSelect a milestone and trace its driving path backward relationship by relationship: path order, logic map and Gantt views…
- Open the Forensic Slip Analysis demonstrationFinds where the schedule moved between updates and against the baseline, ranks the largest slips and pulls, and shows which…
- Open the Delay Consequence Ranking demonstrationGives every open activity the same slip, recalculates the schedule and ranks activities by the milestones they would move…
- Open the Update-to-Update Trend demonstrationMilestone forecasts for all twelve updates side by side, with critical and negative-float counts; activity-level movement for the…
Watch it working
A narrated screen recording of the Logic Tracer on a synthetic schedule: a late milestone traced back to its driving activity, the logic map, near-driving paths, the Gantt view and a recovery scenario. Fictional project, synthetic data.
Read the transcript
The Logic Tracer starts from a milestone. Ready for Startup is selected.
Trace Path walks backward through the current update, choosing at each step the predecessor with the least relationship float.
The first open activity on the path is the residue gas compressor delivery, ten working days later than the prior update: that is the root cause. Its details show the evidence, a finish-to-start link to its successor with zero relationship float. The slip carries forward, and Ready for Start-up is now seven working days later than the prior update.
The path order table lists every step with its baseline, prior and current dates, the three variances, and the link it drives through.
Near-driving paths check for any relationship within ten days of driving. In this update there are none, so this path alone sets the milestone.
The Gantt view lines the path up against the baseline, the prior update, and the data date.
Finally, a hypothetical recovery. The hydrotest is re-sequenced, and the whole network is rescheduled. It's labeled as a scenario, not the approved schedule, and the milestone recovers three working days.
Discuss your project
Every service is billed at the same hourly rate. See pricing, call 713-303-7576 or send a project request.