Home / Services / Level One Schedules
Level One schedule and milestone analysis
A management-level schedule built as a working application: swimlanes for each part of the project, bars labeled with their start and finish milestones, the ties between them, and the milestone history behind each date.
Problems this solves
- The Level One chart is redrawn by hand every month.
- Leadership cannot see how much margin remains before a contractual date.
- Milestone movement is reported without the logic that caused it.
- Schedule reserve and cost contingency are discussed as if they were the same thing.
What the work covers
Level One applications
Swimlanes, labeled bars, relationship ties with type and lag, scale switching, logic trace and comparison with BL or BL1.
Milestone variance
Milestones at Levels 1, 2 and 3 against BL, BL1 and BL2, with the three variances and the reason each moved.
Schedule reserve
The margin between the forecast and a contractual date, counted in working days and tracked update to update.
Cost contingency
Kept as a separate dollar balance, with any exhaustion forecast built only from a time-phased list of expected draws.
Typical deliverables
- Single-file Level One application in Present and Review modes
- Milestone variance register by level
- Schedule reserve log in working days
- Contingency draw forecast with its assumptions
How the work runs
- Agree the summary structure. Workstream lanes, the start and finish milestone for each bar, and the ties that matter at Level One.
- Link milestones to the detailed schedule. So each Level One date comes from the working schedule, not a drawing.
- Track reserve and contingency. Schedule reserve in working days to the contractual date; cost contingency as a separate dollar balance.
- Present and review. Present mode for the meeting room; Review mode with BL and BL1 comparison for the working session.
See a working demonstration
Each demonstration opens on the home page with a fictional project and synthetic data. Sort, filter and drill into the records.
- Open the Level One Schedule Application demonstrationA management-level swimlane summary schedule with labeled start and finish milestones, driving ties, Present and Review modes…
- Open the Milestone Variance demonstrationMilestones against the baseline, the prior update and the current update, with all three variances, comments, the forecast…
- Open the Mirror Milestones demonstrationMilestones shared between the owner's schedule and a fabrication supplier's schedule: BL, BL 1 and BL2 finish, BL Variance, a…
- Open the Multi-Workstream Consolidation demonstrationEngineering, procurement and construction workstreams on one page, ranked by movement, with the hand-offs that carry delay from…
Discuss your project
Every service is billed at the same hourly rate. See pricing, call 713-303-7576 or send a project request.