Schedules you can see being built.

Primavera P6 activities linked to a 3D construction model, and the reporting software project teams use each week.

Explore Interactive 4D Model
Daylight three-quarter view of the demonstration gas processing train from the site's 3D model: the residue gas compressor shelter and its packages in front, pipe racks, air coolers and process columns behind.
Rendered from the interactive model on this page. Fictional facility, synthetic schedule.

4D Simulation

Levels and disciplines are separate controls. Select an activity to find its geometry, or an object to find its activities.

A demonstration on a fictional facility with a synthetic schedule. Imports read a P6 activity export saved as CSV. XER, XML, IFC and glTF are future integrations and are not read by this page. Models are for planning and communication, not engineering design.

Reporting Technology

Analysis software that answers why the schedule moved, not only what is due next. Ten working applications, written for this site and running on one synthetic project, so every number agrees across them. Each opens full screen.

Baselines and sign conventions
BL
Original approved baseline.
BL1
Prior update (update 11, data date 19-Oct-26).
BL2
Current update (update 12, data date 16-Nov-26).
Previous Var
BL1 finish minus BL2 finish.
Current Var
BL finish minus BL2 finish.
Sign
Working days. Negative means the current date is later (behind); positive means earlier (ahead); 0 means no change.

Case study: one late delivery, traced to the finish

In the current update the residue gas compressor delivery (P2050) moved 10 working days later than the prior update. The tracer follows it through compressor setting (C3240) and piping tie-ins (C3320). Hydrotest (C3310) was re-sequenced and recovered 3 days, so mechanical completion and commercial operation move 7 days.

Off the driving path, instrument loop checks (C3420) slipped 10 days with float to spare, and two activities recovered time. The review asks the contractor to explain the factory acceptance re-test behind P2050 first.

  1. P2050Compressor delivery, −10d
  2. C3240Set compressor packages, −10d
  3. C3320Equipment piping tie-ins, −10d
  4. C3310Hydrotest, re-sequenced, −7d
  5. M1020Mechanical completion, −7d
  6. M1040Commercial operation, −7d

Services

McKowen Project Controls, LLC is an independent consulting and technology services firm in Houston, Texas. We plan and control capital projects in Primavera P6 and build the software that makes the schedule visible: 4D models, analysis tools and weekly reporting systems.

4D construction simulation

Schedule-linked models for sequencing, constructability reviews and progress communication. Every modeled object carries an Activity ID, so levels, disciplines and packages can be played, compared and questioned.

Schedule analysis software

Forensic slip analysis, logic tracing, milestone variance across BL, BL1 and BL2, update trends and quality diagnostics, delivered as offline applications that run on each new P6 export.

Weekly reporting systems

Validated imports, week-over-week change tracking, resource and workstream reporting and control-room dashboards that a project team runs without a programmer.

Planning, scheduling and schedule reviews

Baselines, integrated master schedules, updates and recovery schedules, and independent reviews of contractor baselines and updates with delay analysis support.

Our applications run offline in the browser; a client's schedule stays on the client's machines. We do not issue engineering design deliverables, legal opinions or expert-witness testimony.

Pricing & Transparency

Hourly consulting runs on a prepaid retainer, applied against actual billable hours. Custom software and 4D modeling are priced by proposal.

Project Controls Consulting
$195/hour
The rate includes the company's provision for business income taxes; no separate tax surcharge is added to invoices. Sales or other transaction taxes, where legally required, are calculated and shown separately.
Initial Prepaid Retainer
$7,800
40 hours at $195, received before work begins. The retainer is drawn down by billable hours; it is not a fee on top of them.
Retainer Replenishment
$3,900
20 hours at $195, invoiced when the prepaid balance reaches 20 hours and payable on receipt. Work may be suspended if the balance is used up before payment arrives.
Custom Software & 4D Modeling
Request a Proposal
Custom HTML reporting applications, enterprise software integrations, forensic schedule investigations and 3D/4D construction modeling are priced by individually negotiated proposal, based on scope, technical requirements, deliverables and complexity.

Billing practices

  • Detailed time tracking and itemized invoices.
  • Prepaid hours used and remaining shown on every invoice.
  • Written approval before any work outside the agreed scope.
  • Travel, lodging, transportation, specialized software licenses and third-party project expenses only with prior written client approval.
  • No undisclosed charges.
  • Unused prepaid funds reconciled and refunded according to the executed agreement.
Request a Proposal

Contact

Tell us about the project and the decision you need to make. For a fixed deadline, such as a bid or a recovery schedule, choose "Urgent schedule work".

Houston, Texas. Remote or on site by arrangement.

Email [email protected]

Send request opens your email app with this message filled in, addressed to [email protected]. Review it and press send.

Advanced demo workspaceThe full P6-style schedule with look-ahead, schedule quality checks and forecast history, plus four more reporting tools. For reviewers who want the detail.